Back
HR-PRECAST-ELEVATIONS-N-S-rev4.pdfdrawing
L-0012 · Precast external panels, Levels 1-14
Chain of custody verifiedUploaded 27 Mar 2026, 11:30 pm3105 KBSHA-256 c-1bf91…a3c1bProject: Harbour Residences, Pyrmont
Procuralink
Precast external panels, Levels 1-14
Harbour Residences, Pyrmont · 42 Union Street, Pyrmont NSW 2009
Reference
HR-PRECAST-ELEVATIONS-N-S-rev4
Revision
R4
Scale
1 : 100 at A1
ABCDEFGHIJ
1234567
24 00015 600LEVEL 05 — STRUCTURAL FLOOR PLAN
Client
Meridian Developments
Project
Harbour Residences, Pyrmont
Date
27 Mar 2026
Rev
R4
Drawn: J. Liu
Checked: T. Whitfield
Approved: S. Chen
Drawing no: HR-PRECAST-ELEVATIONS-N-S-rev4
Revision history
RevDateDescription
R127 Mar 2026Issued for tender
R227 Mar 2026Coordination review
R327 Mar 2026Issued for construction
R427 Mar 2026Updated per RFI-0042
Notes
  1. All dimensions in millimetres unless noted.
  2. Structural members to AS/NZS 4100.
  3. Connections to structural engineer details sheet S-201.
  4. Refer to architectural set for finishes.
  5. Do not scale. Figured dimensions govern.
Issued via Procuralink · audited workflow · Meridian Developments
HR-PRECAST-ELEVATIONS-N-S-rev4Page 1 of 1