Back
HR-STEEL-PODIUM-SK-001.pdf
drawing
L-0023 · Structural steel, podium
Share
Print
Download
Chain of custody verified
Uploaded 20 Mar 2026, 11:30 pm
1777 KB
SHA-256 c-15f91…a3c15
Project: Harbour Residences, Pyrmont
Procuralink
Structural steel, podium
Harbour Residences, Pyrmont · 42 Union Street, Pyrmont NSW 2009
Reference
HR-STEEL-PODIUM-SK-001
Revision
R1
Scale
1 : 100 at A1
A
B
C
D
E
F
G
H
I
J
1
2
3
4
5
6
7
24 000
15 600
LEVEL 05 — STRUCTURAL FLOOR PLAN
Client
Meridian Developments
Project
Harbour Residences, Pyrmont
Date
20 Mar 2026
Rev
R1
Drawn:
J. Liu
Checked:
T. Whitfield
Approved:
S. Chen
Drawing no:
HR-STEEL-PODIUM-SK-001
Revision history
Rev
Date
Description
R1
20 Mar 2026
Issued for tender
R2
20 Mar 2026
Coordination review
R3
20 Mar 2026
Issued for construction
R1
20 Mar 2026
Updated per RFI-0042
Notes
All dimensions in millimetres unless noted.
Structural members to AS/NZS 4100.
Connections to structural engineer details sheet S-201.
Refer to architectural set for finishes.
Do not scale. Figured dimensions govern.
Issued via Procuralink · audited workflow · Meridian Developments
HR-STEEL-PODIUM-SK-001
Page 1 of 1